Parks & Green Spaces

A managed dog washing point — designed for sensitive green spaces.

A fully managed visitor amenity engineered around the constraints of managed green spaces — drainage compliance, ecology, and reversibility from the first line of the design brief, not adapted from a retail concession.

Funding100% privately funded
DrainageClosed — foul sewer only
SitingFully reversible
Woof Self Wash shelter sited on existing hardstanding at the edge of a park car park
Fig. 01 — Unit sited on existing hardstanding3m × 2m
Footprint
3m × 2m
Surface-mounted, incl. shelter — no excavation
Water Use
40L per wash
vs ~100L typical at home — ~60% less
Wastewater
Foul sewer only
Never to soil, surface water, or watercourses
Removal
Within 14 days
Site restored at our cost, on request
Environmental Design

Where the water goes is the whole design.

Most questions about siting a wash facility in a green space are really one question: what happens to the wastewater? Our answer is engineered, not promised — a closed system with a single permitted route.

Fig. 02 — Water route, site cross-sectionNot to scale · Indicative
EXISTING HARDSTANDING WATERCOURSE WASH UNIT MAINS WATER IN · 40L / WASH FOUL SEWER 100% OF WASTEWATER NEVER TO SOIL / GROUNDWATER NEVER TO SURFACE WATER / WATERCOURSE
Controlled water route Blocked by design Habitat untouched Aligned with Environment Agency guidance
PRINCIPLE — 01

Reversible by default

Surface-mounted on adjustable feet. No excavation, no permanent foundations, no landscape change. Removed within 14 days and the site restored at our cost — leaving no trace the facility was ever there.

PRINCIPLE — 02

Nothing harsh, nothing synthetic

100% natural, biodegradable, eco-certified formulations — free from phosphates, synthetic fragrances, and harsh detergents. Restocked by us; nothing else ever enters the system.

PRINCIPLE — 03

Sited in transitional zones

Within hardstanding areas — car parks, service yards, path edges — never core habitat. Non-habitat in footprint and compatible with BNG-sensitive schemes, subject to site-specific ecological assessment.

The Challenge

An unmet visitor need — and an active environmental pressure.

This isn't about adding a commercial offer to a park. It's about resolving something that is already happening on site, unmanaged.

A — The Visitor Problem

Every muddy walk ends the same way.

A heavily muddy golden retriever sitting on a woodland path beside a stream
Fig. 03 — The end of a muddy walk

Dog walking is one of the most common reasons people visit parks — in many parks, the single most cited reason. Yet after every wet walk, owners face the same difficulty: no managed provision on site. Our survey of London dog owners:

84%
would use a dog wash at their local park
72%
would use the service at least once a week
46%
avoid parks altogether on muddy days
74%
find washing their dog at home difficult
B — The Environmental Pressure

With no managed option, washing happens anyway.

In the absence of a controlled facility, some visitors resort to informal rinsing at the most convenient water they can find — and in a park, that means the most sensitive places in it.

Lakes, ponds & stream edges

Shampoo residues, flea-treatment chemicals, and disturbed sediment enter aquatic habitats directly — pressure that falls hardest on the water bodies parks work hardest to protect.

Bank erosion & wildlife disturbance

Repeated access at the same informal washing points wears banks, damages marginal vegetation, and disturbs nesting and feeding wildlife.

How a managed point resolves it

A designated facility redirects washing away from watercourses into a closed system — converting an unmanaged environmental pressure into a controlled, monitored, fully reportable amenity. The same pressure BNG frameworks seek to manage.

Water Use

Less water than the wash it replaces.

A controlled 40-litre cycle replaces an unmetered home wash — heated water, shampoo, conditioner and drying included.

≈ 60% LESS WATER PER WASH
TYPICAL HOME WASH~100L
WOOF SELF WASH · FULL CYCLE40L

100% natural & biodegradable formulations · all wastewater to foul sewer

The Partnership Model

We carry the operational weight. Your involvement ends at granting permission.

What We Provide

Equipment and siting — fully funded by us, sited at no cost to your organisation

All consumables — natural shampoos and conditioners, restocked weekly at no charge

Maintenance & monitoring — fortnightly servicing, 24/7 remote monitoring, same-day fault response

Customer support — a dedicated line for all visitor enquiries; nothing reaches your team

£10m public liability — your organisation named as an additional insured party if required

Monthly reporting — usage, performance, and environmental compliance, shared openly

What You Provide

Approximately 3m × 2m on suitable existing hardstanding

Access to mains water and a single-phase electrical connection

A foul drainage connection point

A licence or concession agreement permitting the siting

That's it. No capital outlay. No staffing. No maintenance responsibilities. No operational costs.

Footprint
Approx. 3m × 2m incl. shelter
Surface
Existing hardstanding preferred
Utilities
Mains water + single-phase power
Drainage
Foul sewer connection required

Shelter design, exterior finish and colour scheme adapted in consultation with your team — including park or partner branding.

The Pilot Pathway

Start small. Measure everything. Decide with evidence.

We propose a short-term pilot — typically three months — with all costs borne entirely by us and no long-term commitment at the outset. If it doesn't earn its place, it leaves without a trace.

01
Site Assessment
Weeks 1–3

Walkover with your team to agree siting, assess utilities and drainage, and confirm planning position. RAMS, drainage method statement, and insurance documentation shared.

02
Siting
Weeks 4–6

Unit delivered and sited on agreed hardstanding — typically completed within 1–2 days. All works and commissioning managed entirely by us.

03
Active Pilot
Months 2–4

Facility operational. Monthly usage and operational reports shared with your team; environmental compliance monitored throughout. Joint review arranged at pilot end.

04
Evaluation
Month 4+

Reviewed against the success criteria agreed at the outset. Proceed to a longer-term arrangement, extend — or conclude, with removal within 14 days at our cost.

Success Criteria — Agreed Before We Begin
Metric
Target
Environmental compliance
Zero incidents — no drainage concerns, no habitat disturbance
Operational uptime
90%+ availability throughout the pilot period
Visitor feedback
Positive response from dog-owning visitors
Usage
Wash volumes demonstrating genuine local demand
Community acceptance
No concerns raised by stakeholders or adjacent users
Who We Are

Founded by park visitors, designed with park managers.

Woof Self Wash is a London-based company founded by regular park visitors and dog owners. We develop partnerships that are collaborative, evidence-led, and operationally straightforward — working alongside park management teams, not simply placing units and walking away.

We recognise that managed green spaces carry environmental, ecological, and reputational responsibilities well beyond typical concession considerations. Every aspect of this service was designed around those responsibilities — drainage compliance, product formulations, footprint, and reversibility.

Certified B Corporation — Pending certification mark
Pending B Corporation™Independently verified by B Lab UK for social & environmental performance, transparency, and accountability.
Woof Self Wash unit sited within an existing woodland car park
Fig. 04 — Sited within a transitional hardstanding zoneHabitat untouched
Common Questions

Asked by park teams, answered directly.

It depends on your site and local authority. Many locations qualify under permitted development rights — particularly surface-mounted units sited on existing hardstanding. We assess planning requirements during our site visit and can support the application process if formal permission is needed.
No. The unit is surface-mounted on adjustable feet with no ground excavation or permanent groundworks. Where no adjacent hardstanding is available, a small fully reversible base may be used. No landscape change of any kind.
The facility is designed for deployment in ecologically sensitive locations — sited within hardstanding transitional zones, not within core habitat areas. Its non-habitat footprint, closed drainage, and biodegradable formulations make it compatible with BNG-sensitive schemes, subject to site-specific ecological assessment and, where relevant, Natural England consultation.
Yes. Exterior finish, colour scheme, and shelter design are all developed in consultation with your team — ensuring compatibility with the site, its surroundings, and any relevant design or landscape guidelines. Park or partner branding can also be incorporated.
All units are monitored remotely in real time. If a fault is detected, our operations team is alerted immediately and we attend the same day. Your team has no maintenance responsibilities whatsoever.
We offer flexible arrangements tailored to your organisation — including revenue share, fixed licence fee, or hybrid models. For a short-term pilot, we typically propose a straightforward licence with no financial commitment from your side. All terms are agreed in advance and remain subject to your organisation's requirements and approval processes.
Yes — £10 million public liability coverage. Your organisation can be named as an additional insured party if required.
£12 per wash — covering a fully automated wash and dry cycle of around 10 minutes: heated water, shampoo, conditioner, and integrated dryer. All payments are contactless via the Nayax terminal. No app, no account, no booking required.
Next Steps

A short call or a site walkover — whichever suits your team.

Tell us a little about your site and we'll come back within one working day.

01

A brief introductory conversation to discuss your site's priorities and initial questions

02

A site walkover to assess a suitable location and discuss utilities and drainage access

03

Sharing of supporting documentation — RAMS, drainage method statement, insurance summary

04

Discussion of pilot timeline, site requirements, and any conditions your team would include

Download Brochure

Prefer email? info@woofselfwash.co.uk

Request a Site Walkover

We'll only use your details to respond to your enquiry. No mailing lists, no sharing with third parties.